Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | double-yellow, twitterimport |
Date time: | 3.37pm, Friday 25th January, 2019 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | simon |
Copyright: | Copyright with no re-distribution rights |
Download: | View full-size original |
Source URL: | https://twitter.com/RTaylorUK/status/1088823068779335687 |
Credit: | Richard Taylor [Twitter username: 'RTaylorUK'] |
Area: | Cambridge |
@FinKnopsMckim @camcycle Here’s another photo of the situation t.co/X2s9x1NQC7
Comments reflect the views of the original submitter only.