Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | arburyroad, cambridge, cycleway, double-yellow, raisedtable, triangle |
Date time: | 2.20pm, Wednesday 27th February, 2019 |
Time line: | Earlier | Later |
Facing: | Bearing of 316° |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Raised table on Arbury Road.
Comments reflect the views of the original submitter only.