Category: | Cycleway: An example of good practice |
Tags: | dropkerb, dropped, kerb |
Date time: | 5.39pm, Saturday 10th March, 2007 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | martin |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Dropped kerb moved to this much more sensible location as a direct result of the Cycling Campaign's intervention.
Comments reflect the views of the original submitter only.