Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | busway |
Date time: | 2.59pm, Sunday 16th June, 2019 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | baker |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Trumpington busway path looking back to Hauxton Road bridge. There is no possibility of widening the path under the bridge but minimal works could add 1m width.
Comments reflect the views of the original submitter only.