Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | busway |
Date time: | 3.02pm, Sunday 16th June, 2019 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | baker |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Trumpington busway looking NE under Shelford Road Bridge. With removal of lighting pillar 1m could be added to the width of the path, even under the bridge.
Comments reflect the views of the original submitter only.