Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | busway |
Date time: | 3.18pm, Sunday 16th June, 2019 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | baker |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Busway north of Long Road underpass. With moving of light pillars and cutting of hedge at least 1.5m could be added to width of busway path.
Comments reflect the views of the original submitter only.