Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Event or temporary issue |
Tags: | busway, cambridge |
Date time: | 12.11pm, Thursday 24th October, 2019 |
Time line: | Earlier | Later |
Facing: | Bearing of 4° |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Cutting back vegetation about a year after a rider was killed on this stretch of the busway cycleway.
Comments reflect the views of the original submitter only.