Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | busway, cambridge |
Date time: | 11.16am, Monday 13th January, 2020 |
Time line: | Earlier | Later |
Facing: | Bearing of 17° |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Busway cycleway near where there was a fatality about eighteen months earlier.
Comments reflect the views of the original submitter only.