Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cambridge, resurfaced, twitterimport |
Date time: | 1.25pm, Wednesday 25th March, 2020 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | simon |
Copyright: | Copyright with no re-distribution rights |
Download: | View full-size original |
Source URL: | https://twitter.com/Bikes4Future/status/1242804683271548928 |
Credit: | Ghosts of bikes past [Twitter username: 'Bikes4Future'] |
Area: | Cambridge |
Wow - what a great job, never enjoyed a new bit of tarmac so much! This has made my ride to The Green Dragon bridge even more of a marvellous pleasure. t.co/FYockbeTNF
Comments reflect the views of the original submitter only.