Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Non-specific |
Tags: | None |
Date time: | 6.46pm, Wednesday 19th September, 2007 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | kbrumann |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Klaas Brumann |
Area: | Cambridge |
This crossing on Arbury Road between Manor Community College and Arbury Court has a planning note for a crossing upgrade. This includes relocated 550mm from the edge into the centre of the cycle way. With 900 new dwellings at the northwestern end of the road (and in Manor's catchment area) traffic is expected to increase.
After upgrade in Jan 08 #12502 .
Comments reflect the views of the original submitter only.