Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | None |
Date time: | 8.26am, Wednesday 16th January, 2008 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | kbrumann |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Klaas Brumann |
Area: | Cambridge |
Crossings upgrade with tactile paving installed, railings removed and poles positioned in the cycle way. Jan 2008. Previous: #11671
(Note: Because crossing does not lead to entry pupils from the Manor School usually do not use the PUFIN crossing).
Comments reflect the views of the original submitter only.