Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cambridge, carterbridge, chisholmtrail, railway |
Date time: | 11.46am, Monday 15th June, 2020 |
Time line: | Earlier | Later |
Facing: | Bearing of 11° |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Taken through the dirty window of the Carter Bridge, the route of the Chisholm Trail, but I don’t think the current works are anything to do with that.
User timbo reports: The works there are for the new carriage wash, to take 12-car trains instead of 8 - loosely connected to the work that closed Mill Road bridge last summer.
Comments reflect the views of the original submitter only.