Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | None |
Date time: | 6.23pm, Friday 22nd August, 2008 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | martin |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
At long last, at the Beehive Centre, years after complaining about it, a dropped kerb (just about flush enough) so that cyclists can exit the dual-use pavement/cycleway onto the road, as many would rather do. Shame it couldn't be aligned better.
(This is actually a new pedestrian crossing but is very useful as a cycle facility.)
Comments reflect the views of the original submitter only.