Category: | Cycleway: Other (infrastructure-related) |
Tags: | cambridge, fendonroad |
Date time: | 8.06pm, Sunday 9th August, 2020 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Cambridge |
I'm not sure what the point of the arrow is, as there's an End of Cycleway sign right in front of it.
Comments reflect the views of the original submitter only.