Category: | Cycleway: An example of good practice |
Tags: | cambridge, cattlegrid |
Date time: | 6.24pm, Friday 25th September, 2020 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
New stronger cattle grid replacing one that was quite bent.
Comments reflect the views of the original submitter only.