Category: | Cycleway: Other (infrastructure-related) |
Tags: | cambridge, fenditton |
Date time: | 2.41pm, Tuesday 1st December, 2020 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Improved route to Fen Ditton (still signed as a footpath, however)
Comments reflect the views of the original submitter only.