Category: | Cycleway: An example of good practice |
Tags: | cambridge |
Date time: | 11.21am, Saturday 12th December, 2020 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Cambridge |
The longitudinal barriers have been removed.
Comments reflect the views of the original submitter only.