Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | bartonroad, cambridge, newnham |
Date time: | 2.45pm, Tuesday 12th January, 2021 |
Time line: | Earlier | Later |
Facing: | Bearing of 132° |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Barton Road cycleway.
A banksman guides a lorry into the site of a new development.
Comments reflect the views of the original submitter only.