Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | cambridge, flood, miltonroad, underpass |
Date time: | 10.23am, Sunday 7th June, 2009 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Tim Burford |
Area: | Cambridge |
Serious flooding on the Sustrans route along the Milton Road (and it seems that there is now no signage at all for northbound cyclists heading towards Milton via the bridge over the A14).
Comments reflect the views of the original submitter only.