Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | None |
Date time: | 4.36pm, Saturday 21st May, 2022 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | jtn20 |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Foot/cycle entrance to the Ironworks development from Hooper Street.
(See #182855 for the other direction)
Comments reflect the views of the original submitter only.