Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | None |
Date time: | 4.35pm, Saturday 21st May, 2022 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | jtn20 |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Foot/cycle exit from the Ironworks development to Hooper Street.
(See #182851 for the other direction)
Comments reflect the views of the original submitter only.