Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cambridge, trumpingtonmeadows |
Date time: | 9.02am, Sunday 10th July, 2022 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Cambridge |
New link from the busway and the Biomedical Campus
Comments reflect the views of the original submitter only.