Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | busway, cambridge, deprecated |
Date time: | 2.18pm, Thursday 19th January, 2023 |
Time line: | Earlier | Later |
Facing: | Bearing of 15° |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
This section of the Maintenance Track's busway has been sectioned off as it is so dangerous.
Comments reflect the views of the original submitter only.