Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | None |
Date time: | 2.41pm, Sunday 5th March, 2023 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | tomajeffs |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Ancoats |
Chorlton cycleway under construction across the Metrolink bridge. Sadly, only one side of the road will have a track. A newer, wider road bridge should replace this old structure.
Comments reflect the views of the original submitter only.