Add to Gallery: | Add this photo to a Gallery |
Category: | Dutch-style cycleway: An example of good practice |
Tags: | cambridge, double-yellow, droppedkerb, eastroad, turnleft, wands |
Date time: | 12.42pm, Wednesday 12th April, 2023 |
Time line: | Earlier | Later |
Facing: | Bearing of 24° |
Added by: | martin |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
The cones blocking the end have now gone, making it much easier to merge into the road
Comments reflect the views of the original submitter only.