Add to Gallery: | Add this photo to a Gallery |
Category: | A hole in the ground to avoid.: A problem that needs to be fixed |
Tags: | collapsingcambridge |
Date time: | 12.24pm, Saturday 13th May, 2023 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Cambridge |
Monster pothole outside the ADC Theatre reported to the county council, who responded 'We are pleased to confirm that work has been ordered to address this issue which will be carried out within 12 weeks.'
Comments reflect the views of the original submitter only.