Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | None |
Date time: | 6.11pm, Friday 6th October, 2023 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | jtn20 |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Looking from Windsor Road to the temporary foot/cycle link to Darwin Green.
(At the time of writing in late 2023, this link is only usable at evenings and weekends; it's not a through route during building site working hours, Mon-Fri 8am-6pm. In the fullness of time, it will be replaced with a permanent, always-open link.)
Comments reflect the views of the original submitter only.