Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | None |
Date time: | 2.20pm, Sunday 22nd October, 2023 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | jtn20 |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Foot/cycle link from Darwin Green public square toward play area, and onward toward Windsor Road.
At the time of writing (late 2023), the through route to Windsor Road is a temporary link which is only usable at evenings and weekends; it is closed during building site working hours, Mon-Fri 8am-6pm.
Comments reflect the views of the original submitter only.