Add to Gallery: | Add this photo to a Gallery |
Category: | A route temporarily barred to cycle access.: Other (infrastructure-related) |
Tags: | bit, new |
Date time: | 1.11pm, Friday 17th September, 2010 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | soundandfury |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Looking through the barrier to see the progress widening the New Bit cycle/footpath.
Comments reflect the views of the original submitter only.