Donate using PayPal

Photomap

Photo number:
Photo #51300

See clip at youtu.be/BYQOzBEafuM

We had the fun and joy of the winter raised strip replacement on this wooden bridge.
www.youtube.com/watch

Then it was removed after considerable complaints.
www.youtube.com/watch

Well this time I bump into a couple of engineers working on the new replacement. The plan this time is to take up all the boards and triple the amount of grip within the board itself.

Currently there is about 1 inch of grip in a 6-8 inch wide board. They want to put in two more. The work will cuase some disruption, but the y plan on doing this work overnight to cause as little disruption as possible to people riding.

I do think there needs to be alternative routing signs for both directions. Just like roadworks that take out a major route. You'd not expect to be dumped in the middle of a well established route as a driver, why expect to do it to anyone riding?

Comments reflect the views of the original submitter only.

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://cambridge.cyclestreets.net/location/51300/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.