Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cambridge |
Date time: | 3.05pm, Tuesday 1st December, 2015 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Cambridge |
Nicely resurfaced, this should last for a decade or two due to the lack of heavy trucks and buses.
Comments reflect the views of the original submitter only.