Donate using PayPal

All photos in & around Cambridge

Showing items 601 to 700 from total of 20,409 items. Ordered by photo # descending.

Photo # Icon Photo Caption Categorisation
93947Photo #93947Secure cycle parking right next to the entrance - best practiceCycle parking:
Good practice
cycleparking
93946Photo #93946Secure cycle parking right next to the entrance - best practiceCycle parking:
Good practice
cycleparking
93945Photo #93945Car-dominated new developmentCar storage:
Problem
carstorage
93944Photo #93944Covered secure cycle parking right next to the entrance - best practiceCycle parking:
Good practice
cycleparking
93935Photo #93935Local cut-through for walkersTrack:
Infrastructure
track
93928Photo #93928Start of the Reach Ride 2015, with the mayor using an adapted cycleBicycle:
Event
bicycles
93927Photo #93927Start of the Reach Ride 2015Bicycle:
Event
bicycles
93926Photo #93926Start of the Reach Ride 2015, with the mayor using an adapted cycleBicycle:
Event
bicycles
93925Photo #93925Start of the Reach Ride 2015Bicycle:
Event
bicycles
93924Photo #93924New developmentRoad environment:
Infrastructure
road
93923Photo #93923New developmentRoad environment:
Infrastructure
road
93922Photo #93922New developmentRoad environment:
Infrastructure
road
93921Photo #93921New developmentRoad environment:
Good practice
road
93920Photo #93920Link from new estate to the guided busway cyclewayCycleway:
Good practice
cycleways
93919Photo #93919Entrance to the guided busway cycleway is a little awkwardCycleway:
Problem
cycleways
93918Photo #93918New cycle parkingCycle parking:
Good practice
cycleparking
93917Photo #93917New route throughCycleway:
Good practice
cycleways
93916Photo #93916New route throughRoad environment:
Good practice
road
93915Photo #93915Speeding vehicles here ruin this route to the stationRoad environment:
Problem
road
93914Photo #93914Widened path is a great improvement and will result in the grass not being turned into mud as beforeCycleway:
Good practice
cycleways
93913Photo #93913Widened path is a great improvement and will result in the grass not being turned into mud as beforeCycleway:
Good practice
cycleways
93912Photo #93912New entranceway to estate breaks continuity of the cyclewayCycleway:
Problem
cycleways
93911Photo #93911New entranceway to estate breaks continuity of the cyclewayCycleway:
Problem
cycleways
93910Photo #93910Wheelchair resting points on the Jane Coston BridgeCycleway:
Good practice
cycleways
93909Photo #93909Potential landing point for Chisholm Trail bridgeCycleway:
Event
cycleways
93908Photo #93908TowpathCycleway:
Misc
cycleways
93907Photo #93907Annoying new gate createdCycleway:
Problem
cycleways
93906Photo #93906Cycle parking has been removedCycle parking:
Problem
cycleparking
93905Photo #93905Cars driven onto the pavement illegallyEnforcement:
Problem
enforcement
93904Photo #93904Cars driven onto the pavement illegallyEnforcement:
Problem
enforcement
93903Photo #93903Cycle parkingCycle parking:
Good practice
cycleparking
93902Photo #93902Christ's Lane - space here for cycle parkingCycle parking:
Problem
cycleparking
93901Photo #93901Cycles parked informally - not enough cycle parking in the areaCycle parking:
Problem
cycleparking
93900Photo #93900New cycle parkingCycle parking:
Good practice
cycleparking
93899Photo #93899Christ's Lane - space here for cycle parkingCycle parking:
Problem
cycleparking
93898Photo #93898Potential location here at Post Office Terrace for the third city-centre cycle parkCycle parking:
Misc
cycleparking
93897Photo #93897Potential location here at Post Office Terrace for the third city-centre cycle parkCycle parking:
Misc
cycleparking
93896Photo #93896Potential location here at Post Office Terrace for the third city-centre cycle parkCycle parking:
Misc
cycleparking
93895Photo #93895Potential location here at Post Office Terrace for the third city-centre cycle parkCycle parking:
Misc
cycleparking
93894Photo #93894Potential location here at Post Office Terrace for the third city-centre cycle parkCycle parking:
Misc
cycleparking
93893Photo #93893Potential location here at Post Office Terrace for the third city-centre cycle parkCycle parking:
Misc
cycleparking
93892Photo #93892Potential location here at Post Office Terrace for the third city-centre cycle parkCycle parking:
Misc
cycleparking
93891Photo #93891Potential location here at Post Office Terrace for the third city-centre cycle parkCycle parking:
Misc
cycleparking
93890Photo #93890Potential location here at Post Office Terrace for the third city-centre cycle parkCycle parking:
Misc
cycleparking
93889Photo #93889Potential location through here at Post Office Terrace for the third city-centre cycle parkCycle parking:
Misc
cycleparking
93888Photo #93888Potential location through here at Post Office Terrace for the third city-centre cycle parkCycle parking:
Misc
cycleparking
93887Photo #93887Potential location through here at Post Office Terrace for the third city-centre cycle parkCycle parking:
Misc
cycleparking
93886Photo #93886Not enough cycle parkingCycle parking:
Problem
cycleparking
93883Photo #93883Free cycle lights being given outBicycle:
Event
bicycles
93882Photo #93882Not enough cycle parking, yet plenty of space to install it, if the University could be botheredCycle parking:
Problem
cycleparking
93881Photo #93881Not enough cycle parkingCycle parking:
Problem
cycleparking
93880Photo #93880Terrible quality cycle parking - insecure concrete slotsCycle parking:
Problem
cycleparking
93879Photo #93879Terrible quality cycle parking - insecure wheel-bendersCycle parking:
Problem
cycleparking
93878Photo #93878Terrible quality cycle parking - insecure and overloadedCycle parking:
Problem
cycleparking
93876Photo #93876Poor quality double stacker racks not lastingCycle parking:
Problem
cycleparking
93872Photo #93872Cambridge station cycle park under constructionCycle parking:
Event
cycleparking
93871Photo #93871New Hills Road cycleway under constructionCycleway:
Event
cycleways
93870Photo #93870New Hills Road cycleway under constructionCycleway:
Event
cycleways
93869Photo #93869New Hills Road cycleway under constructionCycleway:
Event
cycleways
93868Photo #93868New Hills Road cycleway, with bus stop bypass, under constructionCycleway:
Event
cycleways
93867Photo #93867New Hills Road cycleway under constructionCycleway:
Event
cycleways
93866Photo #93866New Hills Road cycleway under constructionCycleway:
Event
cycleways
93865Photo #93865New Hills Road cycleway under constructionCycleway:
Event
cycleways
93864Photo #93864New Hills Road cycleway under constructionCycleway:
Event
cycleways
93863Photo #93863ASDA van illegally and thoughtlessly driven onto the pavement and in the cycle laneEnforcement:
Problem
enforcement
93862Photo #93862Hostile roundoboutRoad environment:
Problem
road
93859Photo #93859Cambridge station cycle park under constructionCycle parking:
Event
cycleparking
93858Photo #93858Kingston Street is plagued in evenings by pavement parkingEnforcement:
Problem
enforcement
93857Photo #93857On-street cycle parking heavily used - more neededCycle parking:
Problem
cycleparking
93854Photo #93854Temporary rerouting of path being doneCycleway:
Event
cycleways
93853Photo #93853Temporary rerouting of path being doneCycleway:
Event
cycleways
93851Photo #93851Cambridge station cycle park under constructionCycle parking:
Event
cycleparking
93850Photo #93850Pavement parking barely leaving any space for pedestrians, and certainly not for wheelchair usersEnforcement:
Problem
enforcement
93849Photo #93849Cycle parking needed hereCycle parking:
Problem
cycleparking
93848Photo #93848I was surprised to see fewer parked cars than usual on the right in Charles Street. It made riding through here more pleasant.Car storage:
Event
carstorage
93847Photo #93847New bus stop bypass on Hills Road.Cycleway:
Infrastructure
cycleways
93846Photo #93846New bus stop bypass on Hills Road. This is a photo of it in an unfinished state - a few days later the raised table was filled in to make it step free across see #94250.Cycleway:
Infrastructure
cycleways
93685Photo #93685Initial consultation method for a new bus shelter.General sign/notice:
Infrastructure
signs
93617Photo #93617New route avoiding Station Square - if only there were dropped kerbs.Cycleway:
Infrastructure
cycleways
93613Photo #93613Quite a big queue waits for a break in the downpour on the cycle bridge over the railway at Cambridge.Cycleway:
Event
cycleways
93529Photo #93529I don't know what's happening beneath the south end of Grange Road, but the surface is collapsing in several places.Pothole:
Problem
potholes
93528Photo #93528I don't know what's happening beneath the south end of Grange Road, but the surface is collapsing in several places.Pothole:
Problem
potholes
93526Photo #93526I don't know what's happening beneath the south end of Grange Road, but the surface is collapsing in several places.Pothole:
Problem
potholes
93525Photo #93525One hopes the Robinson College cycle park will reopen before the start of term!Cycle parking:
Event
cycleparking
93524Photo #93524Link from the Coton Path to West Cambridge, now clearly marked - see #52340Cycleway:
Infrastructure
cycleways
93522Photo #93522Let academic brainstorming by West Cambridge Lake not be disturbed by cyclists.General sign/notice:
Infrastructure
signs
93521Photo #93521Cycle parking by West Cambridge Lake and link to the Coton PathCycleway:
Infrastructure
cycleways
93520Photo #93520Ramp for wheelchairs rather than cycles.Other:
Infrastructure
general
93519Photo #93519Covered cycle parking nowhere near any buildings. On a Sunday there were 4 bikes here.Cycle parking:
Infrastructure
cycleparking
93518Photo #93518Pedestrian-oriented plaza at High CrossOther:
Infrastructure
general
93517Photo #93517The Madingley Road access to Eddington has been designed for high volumes of fastish motor traffic, but to be fair, the road then narrows and curves, with a central reservation, to reduce speeds.Road environment:
Infrastructure
road
93516Photo #93516Cycle symbol in the left lane but no ASL so cyclists going ahead or right are in conflict with left-turning vehicles.Road environment:
Problem
road
93515Photo #93515Segregated shared use sign - I suppose the trees and poles form the segregation, but it's not clear. I suppose this is not a public highway and the University can do what it wants.General sign/notice:
Infrastructure
signs
93513Photo #93513Covered cycle parking and newly added tools at the Department of Materials Science and Metallurgy, West CambridgeCycle parking:
Good practice
cycleparking
93511Photo #93511A plethora of signs in Eddington - whenever pedestrians might cross the cycletrack the signage changes from 'segregated shared use' to 'unsegregated shared use' and then back again. There must be a simpler way - very few people will know or care about the distinction.General sign/notice:
Problem
signs
93510Photo #93510Cycle crossing, EddingtonCycleway:
Infrastructure
cycleways
93509Photo #93509Cycle stands and underground recycling bins, EddingtonCycle parking:
Infrastructure
cycleparking
93507Photo #93507Quite a bit of cycle parking near Market Square, Eddington (also across the road in the distance).Cycle parking:
Infrastructure
cycleparking
93506Photo #93506Market Square, Eddington - cycling seems to be permitted hereCycleway:
Infrastructure
cycleways
93505Photo #93505Market Square, Eddington - cycling seems to be permitted here.Cycleway:
Infrastructure
cycleways

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://cambridge.cyclestreets.net/photos/all/page7.html
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.